Kosmen Delivers Industrial Dehumidifier to Gia Dinh General Hospital

Kosmen Tây Nguyên
Published: 20/10/2026, 10:26 - Updated at 21/10/2026, 14:22

High humidity in CT scan rooms can cause condensation, encourage mold growth, and accelerate corrosion of electronic components and connectors. Over time, these conditions can shorten equipment lifespan and affect diagnostic imaging accuracy. To safeguard its medical equipment and maintain a stable operating environment, Gia Dinh General Hospital chose a Kosmen industrial dehumidifier to manage humidity in its CT scan room.

Project Overview

Project Details

  • Location: 425-427-429 No Trang Long Street, Binh Loi Trung Ward, Ho Chi Minh City, Vietnam
  • Sector: Pharmaceuticals & Healthcare
  • Industry: Healthcare & Medical Services
  • Application: Humidity control for diagnostic imaging facilities
  • Installed Equipment: Kosmen KM-90S Industrial Dehumidifier
  • Installation Objective: Maintain relative humidity between 45% and 60% to reduce the risk of moisture-related corrosion and damage to electronic components, protect diagnostic imaging equipment, and support consistent operating conditions.

Benefits of the Installation

  • Maintain relative humidity within the 45-60% target range to create suitable conditions for diagnostic imaging equipment.
  • Reduce the risk of condensation, mold growth, and corrosion affecting electronic components and connectors in the CT scan room.
  • Keep indoor humidity levels consistent despite changes in outdoor conditions.
  • Maintain a dry environment that supports the reliable operation of medical equipment.
  • Deliver continuous, high-capacity moisture removal to meet the hospital's long-term humidity control needs.

Kosmen delivers dehumidifier to Gia Dinh General Hospital

Kosmen delivers dehumidifier to Gia Dinh General Hospital

Kosmen's Project Implementation Process

Stage 1: Understanding the Hospital's Requirements

Gia Dinh General Hospital contacted Kosmen to explore ways to protect its diagnostic imaging equipment from excessive moisture. The hospital needed a solution that would maintain suitable humidity levels in the CT scan room, reduce the likelihood of component damage, and support reliable equipment performance.

During the initial consultation, Kosmen gathered details about the room, the hospital's humidity control targets, and its day-to-day operational requirements. This information was passed to the technical team for review and used to guide the next stages of the project.

Stage 2: Preliminary Assessment and Consultation

Through further discussions with the hospital, the Kosmen team developed a better understanding of the CT scan room's layout, environmental conditions, and the imaging equipment that needed protection.

The hospital required relative humidity to remain between 45% and 60% to minimize condensation and corrosion of electronic components. With these requirements established, Kosmen conducted an initial assessment of the dehumidification needs and identified the key factors to examine during the site visit.

Kosmen assesses humidity control requirements for the CT scan room

Kosmen assesses humidity control requirements for the CT scan room

Stage 3: Scheduling the Site Survey

Once the initial requirements were clear, Kosmen worked with Gia Dinh General Hospital to arrange a site survey. Both parties agreed on the schedule and inspection scope to ensure the visit could be carried out smoothly while accommodating the hospital's daily operations.

Ahead of the survey, Kosmen's technical team prepared the necessary measuring instruments and technical documentation. The assessment would cover the room layout, environmental conditions, and other factors influencing dehumidification performance. Findings from the visit would help the team develop a solution tailored to the hospital's needs.

Stage 4: On-Site Survey and Technical Evaluation

Kosmen's technical team visited Gia Dinh General Hospital to assess the CT scan room, measure humidity levels, and examine environmental factors that could affect the imaging equipment.

The survey confirmed that approximately 120 m² required humidity control, with a target range of 45-60% RH. The team also inspected drainage arrangements and available installation space. These findings provided the basis for determining the required dehumidification capacity, selecting an appropriate equipment location, and recommending a suitable solution for the CT scan room.

Stage 5: Equipment Selection and Installation Planning

Based on the site assessment, Kosmen reviewed the technical requirements and provided Gia Dinh General Hospital with a complimentary consultation on the proposed humidity control solution. The team recommended the Kosmen KM-90S industrial dehumidifier to help maintain the required humidity range and protect diagnostic imaging equipment from moisture-related damage.

Kosmen industrial dehumidifier positioned as recommended

Kosmen industrial dehumidifier positioned as recommended

To determine the most suitable location for the industrial dehumidifier, Kosmen considered the room layout, airflow patterns, and drainage access. The proposed arrangement was designed to support effective moisture removal while allowing convenient equipment operation and maintenance.

Stage 6: Finalizing the Solution and Signing the Contract

After reviewing the proposed solution, Kosmen and Gia Dinh General Hospital agreed to proceed with the KM-90S industrial dehumidifier. The installation location, project schedule, and on-site requirements were confirmed before implementation.

With the technical arrangements finalized, both parties signed the contract and completed the necessary documentation. Kosmen then prepared the equipment, assigned its installation team, and coordinated the work schedule in line with the agreed project timeline.

Stage 7: Delivery, Installation and Commissioning

The Kosmen KM-90S industrial dehumidifier was delivered to Gia Dinh General Hospital according to the agreed schedule. At the CT scan room, Kosmen's technicians positioned the unit in its designated location, completed the installation, checked the operating parameters, and carried out a trial run under actual site conditions.

kosmen-kmKosmen KM-90S installed in the CT scan room-90s-dat-tai-phong-ct-en

Kosmen KM-90S installed in the CT scan room

Following installation, Kosmen and hospital representatives reviewed the dehumidifier's operation and humidity control performance. Once the equipment met the agreed technical requirements, the final inspection and acceptance procedures were completed, and the unit was officially handed over to the hospital for use.

Stage 8: Operator Training and After-Sales Service

After the handover, Kosmen's technical team trained hospital representatives on how to operate and maintain the KM-90S industrial dehumidifier. The training covered humidity settings, operating modes, performance monitoring, cleaning, and routine maintenance.

With this guidance, hospital staff can manage humidity levels in the CT scan room and maintain suitable conditions for diagnostic imaging equipment.

Kosmen also provides ongoing after-sales support, including:

  • Technical assistance tailored to the hospital's humidity control requirements.
  • Volume discounts for large-scale equipment orders.
  • One-for-one replacement within 30 days for products with manufacturing defects.
  • A 24-month equipment warranty, with compressor coverage of up to 36 months.
  • Annual maintenance services for industrial dehumidifiers, limited to two visits.

With experience delivering humidity control solutions for specialized environments, Kosmen is pleased to have been selected by Gia Dinh General Hospital to supply dehumidification equipment for its CT scan room. The installation helps protect diagnostic imaging equipment from moisture-related damage and reflects Kosmen's commitment to providing practical humidity control solutions backed by dependable, long-term service for healthcare facilities.

KOSMEN - PIONEERING SOLUTIONS FOR HUMIDITY CONTROL & AIR QUALITY

  • Head Office: No. 77 Dinh Thi Thi Street, Van Phuc City Residential Area, Hiep Binh Ward, Ho Chi Minh City
  • Representative Office: No. 27B Street No. 12, Hiep Binh Ward, Ho Chi Minh City
  • Hanoi Office: No. NV 4.7, Cau Buou New Urban Area, Thanh Liet Ward, Hanoi City
  • Da Nang Office: No. 41 Vo An Ninh Street, Hoa Xuan Ward, Da Nang City
  • Da Lat Office: No. 38/7, Ba Thang Hai Alley, Xuan Huong - Da Lat Ward, Lam Dong Province
  • Hotline: 0766 899 799 (Northern Region) - 0935 696 695 (Central Region) - 0965 210 874 (Southern Region) - 0975 359 877 (Central Highlands)
  • Website: https://kosmen.com.vn/en